by Kim Do | Jun 28, 2022 | Case Studies
Jena Choctaw Pines Casino Smoke Removal Upgrade Equipment: GPS-iMOD bar, GPS-FC48-AC ^ LOCATION Dry Prong, LA (just outside of Alexandria, LA) ^ Facility Size 51,000 sqft ^ Challenge Shortly after opening in 2013, Scott Gaspard, the casino’s Director of Facilities,...
by Kim Do | Jun 27, 2022 | Case Studies
UTHealth East Texas – Operating Suite Comfort Equipment: Danfoss Variable Frequency Drives, UVResources UV coil protection, Armstrong DualArm pumps ^ LOCATION Tyler, TX ^ Challenge The facility faced significant difficulty maintaining the proper temperature and...
by Kim Do | Jun 27, 2022 | Case Studies